lasssst day (12/12/08)
today we came to tafe did a large assesment on the health and saftey booklet then we did a large amount of computer work then it was nok off goodbyeee.
Thursday, December 11, 2008
Wednesday, December 10, 2008
cladding saftey
Safe Work Method Statement
Student name
Ricky aurisch
Supervisor/Lecturer: mr white______________________
Date:________11/12/08_______ Accepted Yes / No
Workshop/college grounds
workshop
Job/work to be carried out
Cladding
Work Activity
Break the job down into steps
Potential Hazards
Safety Controls
1 line the out side of the building with brown paper to represent sisaltion
2 put alcor on the external and internal corners
3 place your pre cut pieces of timber on the external and internal corners and screw
4mark the pieces of timber for cladding allowing 25mm over hang.
Then place your boards on making sure that they are dead level
Paper cut
Could cut your hand with the Stanley when cutting alcor
Don’t screw your hand with the screws
Could stab your self with a pencil
Don’t drop the level on your toe
Be gentle when handling the paper
Keep hand well away when cutting
Keep hand away from screws
Be careful when using a sharp pencil
Hold level firmly
Student name
Ricky aurisch
Supervisor/Lecturer: mr white______________________
Date:________11/12/08_______ Accepted Yes / No
Workshop/college grounds
workshop
Job/work to be carried out
Cladding
Work Activity
Break the job down into steps
Potential Hazards
Safety Controls
1 line the out side of the building with brown paper to represent sisaltion
2 put alcor on the external and internal corners
3 place your pre cut pieces of timber on the external and internal corners and screw
4mark the pieces of timber for cladding allowing 25mm over hang.
Then place your boards on making sure that they are dead level
Paper cut
Could cut your hand with the Stanley when cutting alcor
Don’t screw your hand with the screws
Could stab your self with a pencil
Don’t drop the level on your toe
Be gentle when handling the paper
Keep hand well away when cutting
Keep hand away from screws
Be careful when using a sharp pencil
Hold level firmly
day 8 (10/12/08)
today we started in the workshop were we had a big cleanup around were we had hung our doors the went to the class room to do some revision on the cladding exercise book becaise we had a test that afternoon after lunch we got crakin on our tests nd finshed before arvo smoko after that we had some more study time for the big calcs test that we wil hav tomoro morning.
today we started in the workshop were we had a big cleanup around were we had hung our doors the went to the class room to do some revision on the cladding exercise book becaise we had a test that afternoon after lunch we got crakin on our tests nd finshed before arvo smoko after that we had some more study time for the big calcs test that we wil hav tomoro morning.
day 7 (9/12/08)
to spent most of my time in the classroom studying for the calculations test wich i posted on my blog then did some saftey sheets wich are also on my blog. then we did the calcs test then we went to the workshop were the people were hanging door but i had already finished my door last week so i went to the libary to do some more computer work.
to spent most of my time in the classroom studying for the calculations test wich i posted on my blog then did some saftey sheets wich are also on my blog. then we did the calcs test then we went to the workshop were the people were hanging door but i had already finished my door last week so i went to the libary to do some more computer work.
Monday, December 8, 2008
cladding list
Project Construction Plan Assignment
Complete this assignment to form part of your portfolio.
In your own words describe the steps involved and tools / equipment required for the project
Name
Ricky aurisch
Date
9/12/08
Project
name
cladding
Construction steps
How it happens
Tools and Equipment required
1
Lace the out side of the house with brown paper then tape it all into place
Brown paper, tape
2
Place the 2 pre cut pieces of pine both the inertial and external pieces to be screwed
Drill, screws
3
Mark up your pieces of pine leaving a 25 mm over hang for each piece
Tape, square, pencil
4
Start placing your cladding up making sure all pieces are dead level then your finishes
Screws, drills, level
Complete this assignment to form part of your portfolio.
In your own words describe the steps involved and tools / equipment required for the project
Name
Ricky aurisch
Date
9/12/08
Project
name
cladding
Construction steps
How it happens
Tools and Equipment required
1
Lace the out side of the house with brown paper then tape it all into place
Brown paper, tape
2
Place the 2 pre cut pieces of pine both the inertial and external pieces to be screwed
Drill, screws
3
Mark up your pieces of pine leaving a 25 mm over hang for each piece
Tape, square, pencil
4
Start placing your cladding up making sure all pieces are dead level then your finishes
Screws, drills, level
window instaltion saftey
Safe Work Method Statement
Student name
Ricky aurisch
Supervisor/Lecturer:mr white__________________
Date:_____9/12/09__________ Accepted Yes / No
Workshop/college grounds
workshop
Job/work to be carried out
Window installation
Work Activity
Break the job down into steps
Potential Hazards
Safety Controls
1 Find a frame and set it up in the vice
2 fixed 4 pieces of weather board to the edges of the frame to determine how to protrude
3 remove weather board and line the outsides with weather proof alcor
4 nail all weather boards around the window.
5 spin the frame around nail some mdf around the interior to act as gyprock
6 insert your sill with routed edges so arcatrave can sit on
7cut some legths of pine for the arcatrave to nail to and insert
8 cut for 3 lengths of arcatrave to fit the window nicely then finished
A nail could prick you in the finger
Could cut your finger on the mitre saw
Could hit your hand with the hammer when nailing the alcor to the frame
Nail your hand to the frame
Smash finger with hammer
Get finger caught in the router
Get hand caught in mitre saw
A dodgy bit of arc with a nail hanging out when u cut it could fly off and hit some one
You check the frame thouraly
Hold the wood firmly and keep fingers away from the blade
Gently tap the nail in place the take hand away and hit it hard
Make sure your hand is out of the nail guns way
Take time and make sure your hands not in the way
Keep your hand away from the spinning blade
Keep hand away from the blade
Check all pieces before cutting
Student name
Ricky aurisch
Supervisor/Lecturer:mr white__________________
Date:_____9/12/09__________ Accepted Yes / No
Workshop/college grounds
workshop
Job/work to be carried out
Window installation
Work Activity
Break the job down into steps
Potential Hazards
Safety Controls
1 Find a frame and set it up in the vice
2 fixed 4 pieces of weather board to the edges of the frame to determine how to protrude
3 remove weather board and line the outsides with weather proof alcor
4 nail all weather boards around the window.
5 spin the frame around nail some mdf around the interior to act as gyprock
6 insert your sill with routed edges so arcatrave can sit on
7cut some legths of pine for the arcatrave to nail to and insert
8 cut for 3 lengths of arcatrave to fit the window nicely then finished
A nail could prick you in the finger
Could cut your finger on the mitre saw
Could hit your hand with the hammer when nailing the alcor to the frame
Nail your hand to the frame
Smash finger with hammer
Get finger caught in the router
Get hand caught in mitre saw
A dodgy bit of arc with a nail hanging out when u cut it could fly off and hit some one
You check the frame thouraly
Hold the wood firmly and keep fingers away from the blade
Gently tap the nail in place the take hand away and hit it hard
Make sure your hand is out of the nail guns way
Take time and make sure your hands not in the way
Keep your hand away from the spinning blade
Keep hand away from the blade
Check all pieces before cutting
Subscribe to:
Posts (Atom)