(day 3) 3/12/08
today we started in the workshop were we were to carry on with our window frame project were we were up to doin the interier wich we got some thin mdf to represent the gyprock the we fixed some chock blocks around the frame that had to be 10 mm of the actual window frame the i made my window sill were checked out the ends so it can be slid into the frame then routed the edges then lightly sanded fixed it in then it was only the arcatrave to be placed around then it was finished then after lunch we came to the computer room to complete our blogs.