Thursday, December 4, 2008

day 5

(day 5) 5/12/08
today we started in the work shop with 7 of us selected to install and remove doors single and doubles. i was chosen to be one of the people so we got crakin on our single doors straight away. it was a normal door with a strip of pine down either side witch we plained to suit the door frame once we did that we marked were our hinges were going and chiseled the slots out the screwed the hinges on and just hang the door. then we drilled a door hanled hole and fixed in the door handles. then just before lunch we started on our double doors wich is very simular to the single just hanging one in the oppisite way and making sure they both matched ideticly then fit small door handles and done then came did some blogging.